Thousands of Fort Lauderdale residents were at risk of an interruption
in their water service when a 54" raw sewage line with a 48" saddle cracked behind a mechanical joint at the city's sewage treatment plant. The 8" long crack, 1" wide at the six o'clock position, had an operating pressure of 35 psi, requiring an immediate repair.

A cost-effective solution was provided by NRI using the powerful Syntho-Glass® solution. City staff consulted with NRI and a local contractor to make the pipe repair, which eliminated the need to immediately replace the line. What could have taken several months and cost the city thousands of dollars was completed inexpensively in a matter of hours.

NRI and Syntho-Glass® not only saved the city valuable time and resources, it also guaranteed uninterrupted service for thousands of Fort Lauderdale residents. Syntho-Glass® proves once again that it gets the job done.